Alliance Samgori

logo

CHOOSE FLOOR

B BLOCK

camera icon ლაივ კამერა

Block B of the Alliance City residential complex is conveniently located just a 3-minute walk from Samgori Metro. Work on the construction is underway and will be finished in the fall of 2026.

The building will be of premium quality, constructed with the highest quality materials. Apartments will be delivered to owners in a green frame condition

render

Apartments will be delivered to owners in a green frame condition.

  • Arranged courtyard, fence, and gate, in accordance with the project requirement
  • Electrical distribution networks are connected and operating in place
  • Installed sanitary-technical fixtures (cold water, sewage, ventilation)
  • Gas pipeline installed in operation
  • Metal-plastic balcony door and windows
  • Screeded floor
  • covered walls with gypsum plaster
  • Steel entrance door
b block
Samgori room
Samgori room 2
Samgori Room 3

Leave
Information